{"id":12248,"date":"2025-02-18T10:49:08","date_gmt":"2025-02-18T10:49:08","guid":{"rendered":"https:\/\/vrfp.es\/simuladores\/aerogenerador-loto\/"},"modified":"2025-06-25T06:45:48","modified_gmt":"2025-06-25T06:45:48","slug":"wind-turbine-loto","status":"publish","type":"simuladores","link":"https:\/\/vrfp.es\/en\/simulators\/wind-turbine-loto\/","title":{"rendered":"Wind Turbine (II) \u00b7 Safety and LOTO Procedures"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">DESCRIPTION<\/h3>\n\n\n\n<p>This virtual reality simulator offers the opportunity to teach students the safety measures to be taken into account when carrying out maintenance operations on a wind turbine, such as PPE equipment and energy consignment and deconsignment.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">OBJECTIVE<\/h3>\n\n\n\n<p>To teach the safety elements and procedures when working inside a wind turbine without the need for a real environment that is difficult to transfer to a classroom.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"text-transform:none\">ACTIVITIES<\/h3>\n\n\n\n<div style=\"height:1px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Explanation, identification and provision of PPE for:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Work at height.<\/li>\n\n\n\n<li>Electrical work.<\/li>\n\n\n\n<li>Hydraulic work.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Carrying out nine LOTO Procedures to guarantee safety during wind turbine maintenance:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Disconnection and reactivation of communication with the control center (version 1 and 2) to avoid unwanted actions.<\/li>\n\n\n\n<li>Power cut and restoration in the medium voltage cells, blocking the high power electricity supply.<\/li>\n\n\n\n<li>Stopping and starting up the wind turbine using an HMI.<\/li>\n\n\n\n<li>Wind turbine rotation, and locking and unlocking the Yaw system.<\/li>\n\n\n\n<li>Locking and unlocking the rotation of the rotor, placing the blades in a feathered position.<\/li>\n\n\n\n<li>Depressurization and pressurization of the hydraulic system.<\/li>\n\n\n\n<li>Access to the rotor, avoiding static charge on the blades.<\/li>\n\n\n\n<li>Locking and unlocking of blades for subsequent maintenance.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"featured_media":11769,"template":"","familias-profesionales":[],"class_list":["post-12248","simuladores","type-simuladores","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores"}],"about":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/types\/simuladores"}],"version-history":[{"count":7,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12248\/revisions"}],"predecessor-version":[{"id":15830,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12248\/revisions\/15830"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/media\/11769"}],"wp:attachment":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/media?parent=12248"}],"wp:term":[{"taxonomy":"familias-profesionales","embeddable":true,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/familias-profesionales?post=12248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}