{"id":12265,"date":"2023-10-16T07:43:30","date_gmt":"2023-10-16T05:43:30","guid":{"rendered":"https:\/\/vrfp.es\/simuladores\/trabajos-en-media-y-alta-tension\/"},"modified":"2026-05-13T08:10:50","modified_gmt":"2026-05-13T06:10:50","slug":"medium-and-high-voltage-work","status":"publish","type":"simuladores","link":"https:\/\/vrfp.es\/en\/simulators\/medium-and-high-voltage-work\/","title":{"rendered":"Work on Medium and High Voltage Systems"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">DESCRIPTION<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A simulator for training in maintenance and repair work on medium and high-voltage installations, allowing users to practice safety procedures, the use of PPE, discharging installations, technical analysis and the replacement of components in substations and converters.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">OBJECTIVE<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Training staff in critical procedures for working on medium and high-voltage systems safely and in accordance with regulations, developing technical skills and those related with risk prevention.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"text-transform:none\">ACTIVITIES<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Maintenance at an electrical substation<\/strong>:\n<ul class=\"wp-block-list\">\n<li>Correct use of <strong>personal protective equipment<\/strong> according to the role: site supervisor, discharging operator and local operator.<\/li>\n\n\n\n<li><strong>Application of golden rules and the discharging process:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Preparing for the installation and identifying the most common errors during the process.<\/li>\n\n\n\n<li>Demarcation and signposting of the protected area.<\/li>\n\n\n\n<li>Setting up and preparing the work area.<\/li>\n\n\n\n<li>Safe return to the area.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Maintenance at an electrical substation:<\/strong> Oil sampling and thermographic analysis at a substation.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Work on a converter:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Identification of the various components of the converter.<\/li>\n\n\n\n<li>Replacement of the E1 heating element: Operating the UPS, checking for the absence of voltage and opening circuit breakers to ensure the safe replacement of the heating element.<\/li>\n\n\n\n<li>Replacing the F39 circuit breaker: Disconnecting, blocking and checking that the switchgear is discharged; opening circuit breakers and checking voltages on the machine.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"featured_media":9783,"template":"","familias-profesionales":[],"class_list":["post-12265","simuladores","type-simuladores","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores"}],"about":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/types\/simuladores"}],"version-history":[{"count":7,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12265\/revisions"}],"predecessor-version":[{"id":19329,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12265\/revisions\/19329"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/media\/9783"}],"wp:attachment":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/media?parent=12265"}],"wp:term":[{"taxonomy":"familias-profesionales","embeddable":true,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/familias-profesionales?post=12265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}