{"id":12270,"date":"2023-03-21T09:25:00","date_gmt":"2023-03-21T09:25:00","guid":{"rendered":"https:\/\/vrfp.es\/simuladores\/centro-de-transformacion\/"},"modified":"2025-06-25T06:27:11","modified_gmt":"2025-06-25T06:27:11","slug":"transformer-substation","status":"publish","type":"simuladores","link":"https:\/\/vrfp.es\/en\/simulators\/transformer-substation\/","title":{"rendered":"Transformer Substation"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">DESCRIPTION<\/h3>\n\n\n\n<p>This simulator includes all the tasks that must be carried out for maintenance in a medium and low voltage transformation center, placing special emphasis on the meticulousness of the protocol and the security measures that must be taken into account during the process.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">OBJECTIVE<\/h3>\n\n\n\n<p>To teach the steps to follow for the maintenance of a medium voltage transformation center and to raise awareness about the safety measures to be taken into account.<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">ACTIVITIES<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Maintenance tasks in a medium voltage transformation center:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Selection of PPE and equipment.<\/li>\n\n\n\n<li>Communication with the Control Center to carry out the power cut.<\/li>\n\n\n\n<li>Grounding of the medium voltage cells.<\/li>\n\n\n\n<li>Access to the transformer.<\/li>\n\n\n\n<li>Checking the voltage of the transformer.<\/li>\n\n\n\n<li>Connection of portable grounds to the transformer.<\/li>\n\n\n\n<li>Maintenance of the electrical cabinet.\n<ul class=\"wp-block-list\">\n<li>Cleaning the circuit breakers.<\/li>\n\n\n\n<li>Adjusting the screws on the circuit breakers.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Restoring the connection.<\/li>\n\n\n\n<li>Tidying and cleaning the transformer substation.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dismantling and replacing the transformer in a low voltage cell.<\/strong>\n<ul class=\"wp-block-list\">\n<li>Preparing the work area.<\/li>\n\n\n\n<li>Interrupting and verifying the power cut.<\/li>\n\n\n\n<li>Intervention in the transformer room:\n<ul class=\"wp-block-list\">\n<li>Removal of damaged panels.<\/li>\n\n\n\n<li>Familiarization with the components of the transformer.<\/li>\n\n\n\n<li>Connection of the new transformer.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"featured_media":9633,"template":"","familias-profesionales":[],"class_list":["post-12270","simuladores","type-simuladores","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores"}],"about":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/types\/simuladores"}],"version-history":[{"count":5,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12270\/revisions"}],"predecessor-version":[{"id":15812,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/simuladores\/12270\/revisions\/15812"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/media\/9633"}],"wp:attachment":[{"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/media?parent=12270"}],"wp:term":[{"taxonomy":"familias-profesionales","embeddable":true,"href":"https:\/\/vrfp.es\/en\/wp-json\/wp\/v2\/familias-profesionales?post=12270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}